6-8 minutes - interval of movement of trains of the "green" metro line
7 - the total number of zones into which the metro is divided
10-15 meters - the height of most of the route of both metro lines
11.6 Dirhams (US $ 3.1) - maximum metro fare 1 time
14 trains serve the green line during peak hours, at off-peak times - 10 trains
18 - total number of green metro line stations
20 seconds - waiting period for trains at stations of the "red" metro line
29 - total number of stations of the "red" metro line
47 - total number of pedestrian crossings on the "red" and "green" metro lines
50 - the total number of trains moving on both lines during peak hours, 28 - at off-peak times
52.9 km - the length of the "red" metro line
60-63 minutes occupies the passage between the two terminal stations of the metro "red" line
80 fils (20 cents) - fare in the subway 1 time
110 km / h - the average speed of the metro trains without taking into account the time for stops
500 buses serve the "red" metro line
500 meters - the maximum distance between the metro station and the bus serving it
660 employees police of various ranks ensure the safety of metro passengers
787 buses serve both metro lines
3,000 surveillance cameras installed at stations, in transitions and subway tunnels
116 340 - average daily number of passengers using the metro in June 2010
130 529 -a record number of people using the metro on July 1, 2010
2 000 000 - average monthly number of passengers served by the subway
3 301 959 - a record number of passengers using the metro in August 2010
USD 7.8 billion - metro construction cost